BURNSIDE BRIDGEHEAD


Where is the Burnside Bridgehead Project?

The site is located at the base of the east end of the Burnside Bridge.  The site is 176,215 SF in size and is situated on four-plus city blocks in the Central Eastside Urban Renewal Area. More...

The Burnside Bridgehead Framework Plan

The Burnside Bridgehead Framework plan is intended to be a tool for evaluating development proposals to ensure consistency with the comprehensive vision for the site as defined through 5 key principles:

  • The site should be developed to its full Potential
  • Development should ensure Attainability
  • Embrace Sustainability
  • Catalyze Productivity
  • And promote Vibrancy

» More about the Framework Plan

» Download the Framework Plan (14MB PDF)

For more information about the Burnside Bridgehead Project, visit www.pdc.us or contact PDC Sr. Project Manager Geraldene Moyle at 503.823.3420 or e-mail.








 

2009 Portland Development Commission | 222 NW Fifth Ave. Portland, OR 97209 | 503.823.3200